Hope South Campus Building Program FAQs

General

Where is the Hope South Campus located?
Why does Hope feel the need to build in the Southern area of The Villages?
Will our location adjacent to the Florida Turnpike create a noise problem?
Will it be golf cart accessible?
With the changes in the Hope South Campus building timeline (building the Worship Center first) and the current Capital Campaign shortfall, will Hope Central Campus and Hope Lake Weir Campus still benefit from the Building Hope Project?
Can we have tent events at the Hope South Campus?
How will the Hope Central Campus and the Hope Lake Weir Campus benefit from the Building Hope project?
Since the Activity Center will not be constructed at the present time, what type of activities can occur in the Hope South Campus area until the Worship Center is built?
How were the plans for the Hope South Campus Project modified by the Church Council at the May 2023 Council Meeting?
Where can we go to find the most up-to-date information about the Hope South Campus Building Project or if we have a question?
Are there plans for a Columbarium?

Time Frame

How and when did Hope acquire this property?
What is the present status of, and projected timetable for, the design/building plans for the Worship Center?
How long will worship services remain at Everglade Recreation Center?

Process

Why is the approval of The Villages needed for the Hope South Campus Building Project?
What is the involvement of the City of Wildwood in the approval process for the Hope South Campus Building Project?
After the Worship Center is constructed, when will the Activity Center and the other buildings of the Main Building Complex (Administration/Education Center, Courtyard and Bell Tower) be completed?
Who is responsible for the Hope South Campus Building Project?
What is the Church Council’s OUR PLAN FORWARD presented to the congregation at the Congregation Information Meetings held at all 3 Hope Campuses during the June 3-4, 2023, weekend?

Financial

What is the Worship Center preliminary cost estimate as of November 1, 2023?
How will all costs associated with the construction of the Worship Center be paid?
What is the amount of Capital Campaign funds that need to be raised by the time of the completion of construction of the Worship Center in 2025?
What amount of new loan proceeds are needed to build the Worship Center?
What will be the projected total mortgage loan indebtedness after construction of the Worship Center?
Are those who worship at Everglades expected to raise all the needed funds?
How much did the original Hope Lutheran Church Building and the 2013 addition cost?
What is the cash amount of Capital Campaign pledges/donations on hand?
What is the plan for fund raising for the project?
What is a Capital Campaign and who has been hired to guide Hope through this process?
How will this South Campus Building Project be paid for?

Design

What is the function of the proposed multipurpose space (The Worship Center)?
If a decision is made to build the Activity Center in the future, how might the Activity Center be used?
Initial plans for the Worship Center have previously been reviewed and preliminarily approved by the congregation. What modifications are needed in these preliminary plans since the Activity Center is not being built first?
Why is the Administration/Education Building separate from the Worship Center?
The present plans involve a Worship Center with approximate seating for 450 that can be used for multiple functions. There is not a dedicated Sanctuary Building to be built immediately. What factors were considered in developing these plans?
What is the seating capacity of the Hope Lutheran Central Campus facility?
There is not a specific area designated as “Choir” on the plans. Where will the choir be located?
How have the preliminary design plans for the Hope South Campus Building Project evolved from the start?
What modifications have been made to the Hope South Campus Building Project based on the feedback from the Congregation and Feasibility Study?
What companies are involved in the design/engineering plans for the Worship Center?
Why were modifications made to the design of the Worship Center from the preliminary design plans presented to the congregation at the Special Congregation Meeting on October 7, 2022?
What modifications have been made to the design of the Worship Center from the preliminary design plans presented to the congregation at the Special Congregation Meeting on October 7, 2022, to the design plans reviewed by the congregation at the Town Hall Meeting held on October 6, 2023?
Has the seating capacity of the Worship Center been modified from the design plans presented at the Special Congregation Meeting on October 7, 2022?
If the need (from a function and staff analysis perspective) arises in the future, what would be the cost of converting the warming kitchen to a commercial kitchen?
Will there be a left turn lane or traffic light at the entrance to the Hope South Campus property?
What are the plans for increasing seating capacity as we grow?

Can't find your question?  Please Contact Us

Field is required
Field is required Incorrect email
Field is required
Your message was sent successfully
Sorry, your message was not sent